151. ...............is a process used to determine the maintenance requirements of any physical asset in its operating context?
Correct Answer is: Reliability Centered Maintenance
152. Dispatch provides official authorization for
Correct Answer is: all of these
153. ...............is the application or techniques designed to establish the time for a qualified worker to carry out a specified job at a defined level or performance
Correct Answer is: Work measurement
154. Which of the following is not an objective of quality circle?
Correct Answer is: Employee retrenchment
155. ...............deals with decision-making related to production processes so that the resulting goods or services are produced according to specifications, in the amount and by the schedule demanded and out of minimum cost.
Correct Answer is: Production management
156. Which of the following is not a principles of TQM?
Correct Answer is: Producer focus
157. ...............is the part of an organization that produces the organizations physical goods and services.
Correct Answer is: Operating system
158. Which one of the following is not an objective of materials management?
Correct Answer is: To maximise material cost
159. Which of the following is not a characteristic of intermittent production system?
Correct Answer is: A single product is manufactured in bulk
160. Which of the following is used for issuing materials to different production departments
Correct Answer is: Material requisition
161. Continuous stock taking is a part of
Correct Answer is: Perpetual inventory
162. Which of the following is an input in manufacturing system?
Correct Answer is: all of these
163. Stores department issues materials to the production department on the basis of
Correct Answer is: Stores requisition
164. Which of the following is not a part of production system?
Correct Answer is: Politics
165. Recording of time spent by a worker on different job is called
Correct Answer is: Time booking
166. Which of the following is not a part of product life cyclestage?
Correct Answer is: Competition phase
167. The difference between the actual cost and standard cost is called
Correct Answer is: Variance
168. Which of the following is not an objective of quality assurance?
Correct Answer is: To reduce the quality
169. Qualitycircle is a group of
Correct Answer is: Operatives
170. Which of the following is not a function of purchasing department?
Correct Answer is: Employee selection
171. Safety stock is related to
Correct Answer is: Inventory control
172. Which of the following is not the objective of plant layout?
Correct Answer is: Enhance materials handling cost
173. ..............is undertaken to find out the one best way of doing the thing
Correct Answer is: Job Analysis
174. Which of the following is not an objective of operation management?
Correct Answer is: To reduce product quality
175. Which of the following is not an objective of quality control?
Correct Answer is: Toenhance quality variation among same product category
176. ...............refers to the transformation of the state of input in to output
Correct Answer is: Alteration
177. Lillian and Frank Gilbreth are responsible for principles of
Correct Answer is: Motion study
178. The risk or probability of incorrectly concluding that the conversion process is out of control.
Correct Answer is: Type 1 error
179. ...............involves theactivities relating to procuring materials and supplies consumed during production
Correct Answer is: Purchasing
180. ...............is the sum all the observations and divided by the total number of observations?