Operations Management MCQ Multiple Choice Questions - Page 4 for Practice

91. ...............is the process of determining which job to start first and in what order other jobs should be processed on the machine or in work centre

92. ...............is the system in whichitems are processed in lots and a new lot is undertaken for production only when the production on all items of a lot is complete.

93. ...............is the capacity that specifies a theoretical upper limit above the usual rate of routine operations.

94. Which of the following factors affect capacity planning?

95. ...............is the highest reasonable output rate which can be achieved with the current product specifications, product mix, work force, plant and equipment.

96. Which of the following is an objective of scheduling?

97. ...............is a time table for performing activities utilizing resources or allocating activities

98. In ..............., machines and other supporting services are located according to the processing sequence of the product

99. ...............starts from some data in the future and schedules the required operations in reverse sequence

100. The lay out in which production operation is performed in a fixed position is called

101. ...............decision is the systematic process of determining a geographic site for a firms operations.

102. In this sampling plan, the inspection results of two sample sizes are used to decide whether to accept or reject the complete lot.

103. The layout in which all the equipmentsperforming similar tasks are grouped together is called

104. Which of the following is a part of cost of quality?

105. Which of the following affect the choice of plant location decision?

106. Which of the following is material handling equipment?

107. The founder of the scientific management movement was:

108. Which of the following is a way of codification?

109. The Hawthorne Studies stimulated the development of:

110. The process of buying large quantities of items when its price is low so that tentative profits can be obtained by selling them at higher prices is called

111. Walter Shewhart developed:

112. Which of the following is a function of purchasing department?

113. ...............is the quantity that should be carried by the company so that production is not affected before the next deliver arrives.

114. The moving assembly line was developed by:

115. ...............is used to monitor characteristics that can be measured and have a continuum of values such as height, weight, volume etc.

116. VED Analysis is related with

117. ...............is used to monitor characteristics that have discrete values and can be counted

118. Which of the following cost is associated with inventories?

119. Which of the following factor affects the choice of the plant location selection decision?

120. Which of the following is not a control chart for variables?


Tags

Multiple Choice Questions and Answers on Operations Management

Operations Management Multiple Choice Questions and Answers

Operations Management Trivia Quiz

Operations Management Question and Answer PDF Online