Operations Management MCQ Multiple Choice Questions - Page 5 for Practice

121. Locating the plant nearer to the market is preferred if:

122. Which of the following is not a control chart for attributes?

123. In management literature TQM stands for

124. Industrial buildings may be grouped under

125. ...............is a group of workers from the same area who usually meet to discuss their problems, investigate, recommend solutions and to corrective actions

126. Which of the following is not an advantage of single story building?

127. Which of the following is not a limitation of multi-story building?

128. Which of the following is not an objective of quality circle?

129. Which of the following is not a principles of TQM?

130. Which of the following is not a quality of good plant layout?

131. ...............is the systematic recording and critical examination of existing and the proposed way of doing work as a means of developing effective methods.

132. Which of the following is not anobjective of good plant layout?

133. The costs of all activities incurred to prevent poor quality in products and services.

134. Which of the following is not an objective of MRP?

135. This cost is the cost associated with measuring evaluating, or auditing products or services to assure conformance to quality standards and performance requirements

136. Which of the following is not an Objective of material handling?

137. This cost is the costs resulting from products or services not conforming to requirements or user needs.

138. Which of the following is not aRule for material handling?

139. ...............is a graphical tool to analyse and time the small, physical actions of workers and machine in performing a routine, repetitive, worker- machine task so that idle time can be identified

140. Which of the following is a Rule for material handling?

141. ...............is a process of representing each item by a number, the digit of which indicates the group, the sub-group, the type and the dimension of the item.

142. Which of the following is not atechnique of work measurement

143. ...............is a Manufacturing systems utilizing computer software programs that control the actual machine on the shop floor.

144. Which of the following is a ProductionPlanning?

145. ...............is the Japanese concept of continuous improvement in all things.

146. In ............... the operations are located and the sequence of these operations in the production is determined

147. ...............is concerned with planning the details of the methods required to perform each operation

148. ...............is the process of creating and using mathematical representations of management problems and organizations to predict outcomes of proposed courses of action

149. ...............is the art and science of ensuring that all which occurs is in accordance with the rules established and the instructions issued

150. ...............is the degree to which the design specifications for a product or service are appropriate to its function and use, and the degree to which a product or service conforms to its design specifications


Tags

Multiple Choice Questions and Answers on Operations Management

Operations Management Multiple Choice Questions and Answers

Operations Management Trivia Quiz

Operations Management Question and Answer PDF Online