121. Locating the plant nearer to the market is preferred if:
Correct Answer is: a and b
122. Which of the following is not a control chart for attributes?
Correct Answer is: X chart
123. In management literature TQM stands for
Correct Answer is: Total quality management
124. Industrial buildings may be grouped under
Correct Answer is: a and b
125. ...............is a group of workers from the same area who usually meet to discuss their problems, investigate, recommend solutions and to corrective actions
Correct Answer is: Quality circle
126. Which of the following is not an advantage of single story building?
Correct Answer is: More land is required for building construction
127. Which of the following is not a limitation of multi-story building?
Correct Answer is: Less land is required
128. Which of the following is not an objective of quality circle?
Correct Answer is: Trading on equity
129. Which of the following is not a principles of TQM?
Correct Answer is: Black marketing
130. Which of the following is not a quality of good plant layout?
Correct Answer is: To reduce labour efficiency
131. ...............is the systematic recording and critical examination of existing and the proposed way of doing work as a means of developing effective methods.
Correct Answer is: Method study
132. Which of the following is not anobjective of good plant layout?
Correct Answer is: Toincrease the number of accidents
133. The costs of all activities incurred to prevent poor quality in products and services.
Correct Answer is: Prevention cost
134. Which of the following is not an objective of MRP?
Correct Answer is: To decrease production efficiency
135. This cost is the cost associated with measuring evaluating, or auditing products or services to assure conformance to quality standards and performance requirements