Production and Material Management Objective Question and Answer
Production and Material Management MCQ Multiple Choice Questions - Page 4 for Practice
91. .................type of layout are suitable for non repetitive or standard types of production.
Correct Answer is: Process
92. ................type of layout is also called as functional layout.
Correct Answer is: Process
93. A...................is something which is offered to customers to satisfy their needs or wants
Correct Answer is: Product
94. Congestion is more in..............layout.
Correct Answer is: process
95. Idle time is more in...................layout.
Correct Answer is: fixed
96. In....................type of layout machineries are arranged according to the sequence of operations.
Correct Answer is: line
97. ...............records graphically or diagrammatically, in sequence the movements connected with a process.
Correct Answer is: Process chart
98. To ensure that the proportion of defective items in the manufactured product is not beyond certain limits is called
Correct Answer is: process control
99. Grouping together of like machines in one department is in.................layout.
Correct Answer is: process
100. In.................layout, the facilities are clubbed together so as to form a cell.
Correct Answer is: Cellular
101. ...................dimensions of business definition specify what activities are to be undertaken to produceand deliver products/services.
Correct Answer is: Technology dimension
102. ....................function develops a physical relationship between inputs and outputs.
Correct Answer is: Production
103. ...................may be defined as the ratio between output and input.
Correct Answer is: Productivity
104. ................may be defined as the ratio between output and input.
Correct Answer is: Productivity
105. ....................is defined as a technique of foreseeing or picturing ahead every step in long series of separate operations, each step is to be taken in the right place, of the right degree, and at the right time and each operation is to be done at a maximum efficiency.
Correct Answer is: Production planning
106. ..............involves implementation of production plans or schedules by coordinating different activities.
Correct Answer is: Production control
107. The function of................involves the decision when, what,how, and why to produce goods.
Correct Answer is: production planning
108. ...............is the ratio of available goods and services to the potential resources of the community orthe country.
Correct Answer is: Purchasing power
109. .............is carried out to verify whether a quality system is effective and suitable.
Correct Answer is: Quality audit
110. Select the odd one which is not the required document for the ISO certificate?
Correct Answer is: Contract review
111. Three commonly used productivity variables are
Correct Answer is: labor, capital, and management
112. Malcom Balridge national quality award is used to measure TQM efforts on an.................basis.
Correct Answer is: Annual
113. The therblig symbol used for micro motion of release is..............
Correct Answer is: RL
114. The expected sample size required to arrive at a decision about the lot is called
Correct Answer is: average sample number
115. The objective of good layout is to
Correct Answer is: reduce wastages
116. Select the odd one which is not the dimension of quality?
Correct Answer is: Reassurance
117. which is not a part of 5R of buying?
Correct Answer is: None of the above
118. RPN in total quality management denotes
Correct Answer is: Risk priority number
119. Unavailability of skilled labour is a big problem if we locate our factory in
Correct Answer is: rural
120. ...................function of production planning and control determines the starting time and finishing time foreach operation.