Roofing MCQ Multiple Choice Questions Answers - Page 9 for Practice

241. When installing battens, the contractor can

242. When installing closed-cut valleys care should be taken to make sure shingle end joints are at least how many inches from the centerline of the valley?

243. When installing gravel stops Bobby Ray should

244. When installing random-width slates, offset joints in adjacent courses at least

245. When installing shingles using a 6 inch pattern, you must start the first course with a shingle.

246. When installing tile and flashing along the vertical wall

247. When installing tile roofs according to Roofing Construction and Estimating, on slopes steeper than 6 in 12, you can use

248. When installing wood shingles over space sheathing, adjacent courses should be offset a minimum of how many inches?

249. When installing wood shingles over spaced sheathing, the drip edge should extend

250. When measuring from the apex of the roof to the face edge of the first batten, the heads of the two tiles should not be more than how many inches apart?

251. When more than one piece is required to cover the eaves the lap should be how many inches?

252. When repairing splits, blisters, alligatoring & fishmouths, the patch should be inches wider than the area you are repairing.

253. When reroofing over asphalt shingles, nails should be inches long.

254. When re-roofing over wood or asphalt shingles always use the method to assure a smooth roof.

255. When re-roofing over wood, install shingles using the

256. When re-roofing the Butt-up method means

257. When roofing, use penny nails for 24 inch shingles.

258. When shingling a woven valley, no fasteners should be within how many inches of the valley centerline?

259. When shingling a woven valley, the end shingle should extend beyond the valley centerline at least how many inches?

260. When temperatures do not exceed 125 degrees the type of asphalt to be used below grade is

261. When test cutting BUR systems, test cut an area at least

262. When the horizontal width of a chimney is greater than feet, install a fabricated galvanized metal saddle flashing or a wooden cricket above the chimney.

263. When trimming open valley shingles, leave inches on each side of the valley for the water trough.

264. When trimming valley shingles, leave inches on each side of the valley centerline.

265. When using the mortar-set method on roof slopes of 5 in 12 each eave tile requires how many nails in addition to using mortar?

266. Where a sloping roof meets a vertical wall, flashing must be at least how many inches high?

267. Which is not a factor regarding end laps?

268. Which is not a type of downspout?

269. Which of the following has the greatest coefficient, of thermal expansion?

270. Which of the following is especially vulnerable to leakage?