Bridge Engineering MCQ Multiple Choice Questions Answers | Quiz for Practice

Bridge Engineering Multiple Choice Questions (MCQs) are essential for students and exam aspirants to test and enhance their understanding of key concepts in bridge design, construction, and maintenance. Practice these questions to excel in your exams and interviews.

About Bridge Engineering MCQ Questions

Bridge Engineering MCQs cover a wide range of topics, from the fundamentals of bridge design and materials to advanced concepts in structural analysis and construction techniques. These questions are designed to test your knowledge and application skills in various aspects of bridge engineering.

Why Practice Bridge Engineering Objective Questions?

Practicing Bridge Engineering MCQs offers several benefits. They help you prepare for school and college exams, competitive exams, and job interviews. Regular practice improves your problem-solving skills, enhances your understanding of core concepts, and boosts your confidence in real-world engineering scenarios.

Who Should Use These MCQs?

  • Students preparing for school or college exams
  • Competitive exam aspirants
  • Candidates preparing for interviews

Bridge Engineering MCQ Questions for Practice

1. A bascule bridge is a

2. A bridge of more than ................ span is treated as long span bridge.

3. A bridge of span 25 m may be treated as

4. As far as possible the alignment of a bridge should be

5. Bridge over a dry valley is known as

6. Deep cast bearings are suitable up to .................. spans

7. Fixed plate bearing plates are suitable for spans upto

8. For a major bridge usually the type of foundation is

9. Generally, a culvert has span less than

10. Height of bridge is kept ............... above high flood level

11. If a rocker and roller bearing is provided at one end of a bridge girder, then the other end will be

12. In case of alluvial streams linear waterway is determined by Luceys formula as L = where Q is discharge and C is .............. depending upon the local conditions:

13. In preliminary survey cross sections at ................ interval should be determined.

14. In the design of piers, the water pressure to be considered is

15. Masonry arch bridges are used to span

16. Minimum depth of foundation below the scour line in a arch bridge for piers should not be less than

17. Movable bridges are built across

18. Preliminary survey should be carried out to at least ................ distance on upstream and downstream side

19. R.C.C. piers of the following shapes are not used

20. Rocker bearings are suitable for spans upto

21. Slab bridges are used to a maximum span of

22. Temporary bridges are built during

23. The arrangement made to prevent entry of water at the site of pier construction is known as

24. The bridge having its floor flush with bed of stream is known as

25. The cross section of a pier may be

26. The end supports of a bridge superstructure are known as

27. The floor provided between masonry walls below the river bed is known as

28. The height of concrete pier may be raised by ................. every day during the construction

29. The most suitable foundation for a culvert is

30. The roadside slope of kerb is

Tags

Multiple Choice Questions and Answers on Bridge Engineering

Bridge Engineering Multiple Choice Questions and Answers

Bridge Engineering Trivia Quiz

Bridge Engineering Question and Answer PDF Online