Roofing MCQ Multiple Choice Questions Answers - Page 8 for Practice

211. To install shingles in a woven valley

212. To pass the test, the weight of the test-cut components must be within what percent plus or minus of the specified requirements?

213. To pass the test, the weight of the test-cut components must be within what percent plus or minus of the speciied requirements?

214. To prevent chimneys from leaking the contractor should apply which of the following?

215. Trimming of a sharp valley corner is known as

216. Two joints of shakes should never line up in how many courses?

217. Type IV (special steep) asphalt softens at degrees Fahrenheit.

218. Type IV asphalt has a softening temperature of

219. Type IV asphalt on smooth surfaces lacks which of the following?

220. Type IV asphalt softens at how many degrees?

221. Use a box nail to install a 24-inch tapersplit shake on a new roof.

222. Usually the maximum layers of shingles a roof can support is

223. U-Value of 0.17 will equal R Value.

224. vapor retardant base sheet should be installed when the outside winter temperature is how many degrees or less?

225. Vertical front wall flashing should extend up the wall a minimum of how many inches?

226. water diverter used on the high side of a chimney, usually metal, is

227. Weepholes should be what size in diameter?

228. What pattern is normally used for a hip roof when using three tab shingles?

229. When applying double coverage underlayment on low slopes where icing along the eaves is anticipated, courses should be cemented to a point at least how many inches beyond the interior wall line?

230. When applying elastomeric roofing, brush-apply lap cement at the rate of one gallon per linear feet for a three inch lap.

231. When applying roll roofing on the first course parallel to the eaves, end laps should be a minimum of inches wide.

232. When checking for leaks on a tile roof, look for

233. When completing a T-lock shingle reroof, install the shingles

234. When fabricating the flashing with water guards, the flashing should be anchored to the sheathing with

235. When flashing a valley according to Roofing and Construction Estimating, the contractor should install which of the following in the valley centerline?

236. When flashing at vertical walls, the roofer should do which of the following?

237. When flashing soil stacks it is permissible to

238. When hot-mopping 90-pound material along the eaves, the top of the sheet should be

239. When installing a 6-inch pattern, remove how many inches from the second course?

240. When installing battens on roof slopes of less than 6 in 12, the roofer should use


Tags

Multiple Choice Questions and Answers on Roofing

Roofing Multiple Choice Questions and Answers

Roofing Trivia Quiz

Roofing Question and Answer PDF Online