Roofing MCQ Multiple Choice Questions Answers - Page 7 for Practice

181. The minimum tons of mission tile to cover 2,000 square feet of roofing area is

182. The most common pitch for corrugation is

183. The most widely used type of asphalt shingle is

184. The most widely used type of asphalt shingle is the

185. The number of bundles of shakes required per square with 1/2 inch spacing, 11 V2 inch exposure use number one straight split true edge shakes is

186. The number of bundles per square for straight-split red cedar shakes measuring 18 inches by 3/8 inches is

187. The number of plies required for 20 feet of head is

188. The penny nail is usually adequate for handsplit shakes.

189. The percentage of roofing injuries attributable to hot bitumen work is

190. The placing of asphalt shingles over built-up roofing is

191. The removal of the corner of a shingle in a valley is called

192. The required depth of ribs when using metal decking for a BUR substrate is

193. The required test cut area should be

194. The roof expansion joints are necessary in order to

195. The roofer should allow how many inches of overhang along the rake fascia for the installation of wood shakes according to Roofing Construction and Estimating?

196. The rule of thumb for adequate attic ventilation is

197. The sealing out of water under pressure is called

198. The slates are installed at the upper end of the valley to within two inches of each side of the valley centerline when installing a(n) (slate) valley.

199. The slope of a woven valley should be limited to slopes of at least

200. The softening point of type III asphalt used in roofing should be degrees Fahrenheit maximum.

201. The starter course for wood shingles according to Roofing and Construction Estimating should overhang beyond the eaves fascia

202. The test cut of the BUR system should be

203. The top thin edge of a wood shake shingle is called the

204. The type of mortar to be used when setting tile is

205. The weather check nearest the butt of the tile is called a

206. There should be no fasteners within how many inches of a woven valley centerline?

207. Tile installation on slopes 2 1/2 in 12

208. To allow for expansion and contraction, install a loose 4-inch glass fiber strip covered with?

209. To construct an open valley, shingles at the upper end of an open valley should be inches apart at the centerline.

210. To ensure a snug fit it is good practice to


Tags

Multiple Choice Questions and Answers on Roofing

Roofing Multiple Choice Questions and Answers

Roofing Trivia Quiz

Roofing Question and Answer PDF Online