Building Construction MCQs Quiz Multiple Choice Questions & Answers Page 3


Test Your Skills in Building Construction Quiz Online

Building Construction Questions with Answers

101. At 28 days of curing concrete attains a strength of

102. As per IS :1172-1963, water required per head per day for average domestic purposes is

103. According to the Indian Standard recommendations, a water requirement of how many litres per head per day is assumed for residential buildings.

104. A............roller is a multi purpose roller which is used for various purposes and for practically all type of roads.

105. A.............usually parallel to the plot boundaries and laid down in each case by the Authority, beyond which nothing can be constructed towards the site boundaries.

106. A.............is very useful equipment and it can be used for construction work like to clear the site of work, to make the land level, etc.

107. A...............can be used on wet ground and in all conditions of weather.

108. A square pit, known as................with side as about 1.50 m, is excavated upto a depth at which sufficiently hard soil is available.

109. A city supply includes

110. A building that does not have symmetry & plan, elevation, geometry mass on load is called

111. .........is the top most part of building which provides covering to the entire assembly and the occupants.

112. ..........is very useful equipment and it can be used for construction work like to clear the site of work, to make the land level, etc.

113. ............is a self propelled machine which is used mainly to exert a powerful tractive force for pulling other machines.

114. ............equipment are used to decrease the porosity of earth and to increase the density and strength of the earth.

115. .............wall is constructed in order to support load other than its own.

116. .............type of excavator is used for digging at or below the operating level.

117. .............is a flexible material which is commonly used for the damp proofing.

118. .............are structural members design to carry and transfer transverse loads across space to support elements.

119. ..............is the process in which we cover the structural members of a building to increase the strength of the building.

120. ..............is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies or sub-assemblies to the construction site where the structure is to be located.

121. ..............is a wooden material made artifically from solid wastes like sawdust, flyash and other biodegradable wastes etc.

122. ..............is a process of connecting cables & wires to the related devices such as fuse switches, lights, fans etc to the main distribution board for continuous power supply.

123. ..............are the most commonly used equipment for transportation.

124. ...............consist of a vibrating unit mounted on a screed, plate or roller.

125. ................consists of driving either a hollow tube or a steel rod or an iron rod into the ground.

126. .................is the unit of measurement of intensity of light?

127. .................is the part of building constructed above the plinth level.

Tags

Multiple Choice Questions and Answers on Building Construction

Building Construction Multiple Choice Questions and Answers

Building Construction Trivia Quiz

Building Construction Question and Answer PDF Online

Spreading Knowledge Across the World

USA - United States of America  Canada  United Kingdom  Australia  New Zealand  South America  Brazil  Portugal  England  Scotland  Norway  Ireland  Denmark  France  Spain  Poland  Netherland  Germany  Sweden  South Africa  Ghana  Tanzania  Nigeria  Kenya  Ethiopia  Zambia  Singapore  Malaysia  India  Pakistan  Nepal  Taiwan  Philippines  Libya  Cambodia  Hong Kong  China  UAE - Saudi Arabia  Qatar  Oman  Kuwait  Bahrain  Dubai  Israil  and many more....