Bridge Engineering MCQs Quiz Multiple Choice Questions & Answers


Test Your Skills in Bridge Engineering Quiz Online

MCQ quiz on Bridge Engineering multiple choice questions and answers on Bridge Engineering MCQ questions on Bridge Engineering objectives questions on Bridges with answer test pdf for interview preparations, freshers jobs and competitive exams.

Bridge Engineering Questions with Answers

1. A bascule bridge is a

2. A bridge of more than ................ span is treated as long span bridge.

3. A bridge of span 25 m may be treated as

4. As far as possible the alignment of a bridge should be

5. Bridge over a dry valley is known as

6. Deep cast bearings are suitable up to .................. spans

7. Fixed plate bearing plates are suitable for spans upto

8. For a major bridge usually the type of foundation is

9. Generally, a culvert has span less than

10. Height of bridge is kept ............... above high flood level

11. If a rocker and roller bearing is provided at one end of a bridge girder, then the other end will be

12. In case of alluvial streams linear waterway is determined by Luceys formula as L = where Q is discharge and C is .............. depending upon the local conditions:

13. In preliminary survey cross sections at ................ interval should be determined.

14. In the design of piers, the water pressure to be considered is

15. Masonry arch bridges are used to span

16. Minimum depth of foundation below the scour line in a arch bridge for piers should not be less than

17. Movable bridges are built across

18. Preliminary survey should be carried out to at least ................ distance on upstream and downstream side

19. R.C.C. piers of the following shapes are not used

20. Rocker bearings are suitable for spans upto

21. Slab bridges are used to a maximum span of

22. Temporary bridges are built during

23. The arrangement made to prevent entry of water at the site of pier construction is known as

24. The bridge having its floor flush with bed of stream is known as

25. The cross section of a pier may be

26. The end supports of a bridge superstructure are known as

27. The floor provided between masonry walls below the river bed is known as

28. The height of concrete pier may be raised by ................. every day during the construction

29. The most suitable foundation for a culvert is

30. The roadside slope of kerb is

31. Which one of the following is not a low cost bridge

32. Which one of the following is not a type of culvert?

33. Which one of the following is not the correct statement? Bridge site

34. Width and height of kerbs on bridges are generally ................ respectively.

Tags

Multiple Choice Questions and Answers on Bridge Engineering

Bridge Engineering Multiple Choice Questions and Answers

Bridge Engineering Trivia Quiz

Bridge Engineering Question and Answer PDF Online

Spreading Knowledge Across the World

USA - United States of America  Canada  United Kingdom  Australia  New Zealand  South America  Brazil  Portugal  England  Scotland  Norway  Ireland  Denmark  France  Spain  Poland  Netherland  Germany  Sweden  South Africa  Ghana  Tanzania  Nigeria  Kenya  Ethiopia  Zambia  Singapore  Malaysia  India  Pakistan  Nepal  Taiwan  Philippines  Libya  Cambodia  Hong Kong  China  UAE - Saudi Arabia  Qatar  Oman  Kuwait  Bahrain  Dubai  Israil  and many more....