MCQ quiz on Concrete Technology multiple choice questions and answers on Concrete Technology MCQ questions on Concrete Technology objectives questions with answer test pdf for interview preparations, freshers jobs and competitive exams.
1. A brick scutch should be used to
2. A building line is
3. A d.p.c.
4. A d.p.c. placed under a stone sill should extend on each side of the sill at least
5. A disadvantage with clayey subsoils is that in long periods of dry weather they tend to
6. A horizontal d.p.c. is placed to stop moisure
7. A horizontal member used in trench timbering is a
8. A trench 4.000 m in length, 1.000 m in depth and 1.000 m wide is to be excavated; the sub-soil is clay. The amount to be carted away will be
9. Backfilling and compaction of trenches should be carried out in layers of
10. Before a foundation may be concreted, the natural foundation must be inspected by the
11. Bricks that are subjected to severe weather conditions should be
12. Care should be taken when using a plumb rule during periods of
13. Coarse aggregate is mainly retained on a sieve of
14. Curing of concrete is achieved by providing
15. Dry rot in timber is the result of
16. Hatching is a method which is used to indicate
17. Having set out a rectangular building, the accurate check for squareness of the corners would be to
18. Honeycombs in sleeper walls
19. I n order to qualify for the weekly tool allowance, a bricklayer may be expected to provide
20. If a working drawing is made to a scale of 1 50, a length of 5.5 metres would be shown on the drawing by a length of
21. In open timbering, the poling boards are retained in position by using
22. In tanking construction the cement mortar fill Is used to
23. Intermediate level points between two previously established levels can be determied by using
24. Plasticisers used in mortars increase
25. Sand-lime bricks are hardened by
26. Setting-out lines for walls which divide semidetached houses are derived from
27. Stabilising a bricklayers line in windy conditions is carried out by using
28. The application of asphalt to basements in order to prevent penetration of water is described as
29. The area of a brick which surrounds the frog is termed the
30. The first reading taken from an instrument position is termed the
31. The horizontal d.p.c. is placed not less than150 mm above the
32. The maximum thickness for hardcore when used below oversite concrete is normally
33. The minimum lap for a flexible d.p.c. is
34. The number of layers in which the slump cone is filled and the number of times each layer is rodded is
35. The type of aggregate used for the manufacture of lightweight concrete blocks is
36. The type of material suitable for a flexible d.p.c. is
37. The use of wall plates on the top of sleeper walls is to
38. The usual test for the workability of concrete is the
39. To keep the bed joints to the required thickness, it is advisable to
40. To prevent the occurrence of dry rot below hollow timber ground floors, it is necessary to
Spreading Knowledge Across the World
USA - United States of America Canada United Kingdom Australia New Zealand South America Brazil Portugal England Scotland Norway Ireland Denmark France Spain Poland Netherland Germany Sweden South Africa Ghana Tanzania Nigeria Kenya Ethiopia Zambia Singapore Malaysia India Pakistan Nepal Taiwan Philippines Libya Cambodia Hong Kong China UAE - Saudi Arabia Qatar Oman Kuwait Bahrain Dubai Israil and many more....