121. ...............starts from some data in the future and schedules the required operations in reverse sequence

  1. Scheduling
  2. Backward scheduling
  3. Forward scheduling
  4. all of these

122. The lay out in which production operation is performed in a fixed position is called

  1. Project lay out
  2. Product lay out
  3. a andb
  4. None of these

123. ...............decision is the systematic process of determining a geographic site for a firms operations.

  1. Plant location
  2. Plant layout
  3. Product lay out
  4. none of these

124. In this sampling plan, the inspection results of two sample sizes are used to decide whether to accept or reject the complete lot.

  1. Single sampling plan
  2. Double sampling plan
  3. Questionnaire
  4. Census investigation

125. The layout in which all the equipmentsperforming similar tasks are grouped together is called

  1. product lay out
  2. Process lay out
  3. Combination lay out
  4. None of these

126. Which of the following is a part of cost of quality?

  1. Prevention cost
  2. Appraisal cost
  3. Failure cost
  4. all of these

127. Which of the following affect the choice of plant location decision?

  1. Proximity to markets
  2. Supply of materials
  3. a and b
  4. none of these

128. Which of the following is material handling equipment?

  1. Hand truck
  2. Pulley blocks
  3. Conveyors
  4. all of these

129. The founder of the scientific management movement was:

  1. Frank Gilbreth
  2. Walter Shewhart
  3. Frederick WTaylor
  4. Ford Harris

130. Which of the following is a way of codification?

  1. Numerical code
  2. Mnemonic code
  3. alpha-numeric code
  4. all of these